Placing hours recorded by job and by element tell you what a project really cost. Without them, every bid starts over from a memory.
Placing hours recorded by job tell you what a project really cost. The bid was only a forecast. Comparing the two, job after job, is the only way to know whether your prices hold up, and on which types of work you make or lose money. Without those hours, every new bid starts over from a memory.
This article is part of the delivery and installation step of our guide to rebar software and the complete steel chain. It covers hours on site: why record them, and what makes them useful. How to use them for estimating is covered in estimating rebar placing in hours per tonne.
Because they're paid, but rarely tied to anything. Payroll knows how many hours each ironworker worked in the week. It doesn't always know on which job, even less on which element.
In many companies, the information half exists: in the site foreman's daily reports, in a notebook, in the timesheets, in the memory of the person in charge of placing. It's simply never gathered by project. At the end of the job, you know whether you made money overall, but not why.
Yet placing is often the most uncertain part of a bid. The price of steel can be checked, fabrication is measured at the shop. Hours on site depend on everything that happens there.
Because placing hours depend on the number of pieces and their bending complexity, not only on the weight. A tonne of steel can be a few dozen long straight bars placed with the crane, or several hundred small stirrups to tie one by one.
Take two jobs of the same tonnage. The first is mostly footings and walls in large straight bars. The second is a structural slab with a lot of small bars, bent shapes and openings. On paper, they weigh the same. On site, the second can take far more hours.
That's why a total of hours by job is useful, but a total by element is even more so. It lets you see that your walls are well estimated and your slabs aren't, or the reverse. The factors that make the hours-per-tonne ratio vary (element, bar size, access, season, crane) are detailed in the article on estimating placing.
Enough to compare with the bid, without turning the foreman into a clerk. The essentials:
This last point is often neglected. Mixed in with the planned hours, the hours on extras make the job look more expensive than it was, and the next bid will be inflated for nothing. Kept separate, they serve twice: they keep the history accurate, and they support the invoice for the extra. See writing down extras on site, the same day.
For the same reason as extras: memory fades fast, and crews move. On Friday, nobody remembers how many hours were spent on Monday's columns rather than on the wall. The total then gets split "more or less", and the history loses its value.
The assignment of crews adds a difficulty. When ironworkers go from one site to another over the week, only hours recorded the same day really follow each person. That's one of the links between assigning ironworkers across job sites and tracking hours: the assignment says who was supposed to be where, the hours say what happened.
Finally, hours tracked day by day let you see an overrun during the job, not only at the end. If half the planned hours are already spent and only a third of the steel has been placed, there's still time to find out why: a site that isn't ready, extras not written down, a crew that's too small.
More than estimating. The same hours feed several decisions:
By comparing, at the end of each job, the actual hours with the planned hours, in the same categories. That's where placing hours become an asset: they adjust your own ratios, element by element, instead of reusing the ones passed along from memory.
This feedback only works if the loop isn't broken: the bid broken down by element, the placing recorded in the same categories, the extras kept separate, and someone who does the comparison. The whole rebar chain, from drawing to invoicing, benefits. If you're evaluating a tool to keep this history, ask the question when choosing rebar software.
Metacis is rebar software built by people in the trade. If this question comes up in your company, let's talk: request a demo.