Rebar, one detail at a time.

Product updates, practical guides, and engineering notes from the team building Metacis, the platform for managing rebar production end-to-end.

Start here · Software

Rebar Software: The Complete Guide

Rebar software follows the steel from drawing to invoicing. Who uses it, what it must cover at each step, and how it differs from an ERP. · 12 minRead the article
Topics
17

Rebar Software or ERP: What's the Difference?

An ERP manages money, purchasing and payroll. Rebar software follows the steel from drawing to invoicing. Here is what each one does and where they meet.Software · November 16, 2026 · 4 min
14

Loading Order: How to Prepare a Rebar Truck

Load a rebar truck for the way the site unloads it: placed straight off the truck or unloaded in a pile. Bundles, tags, weight, spring load restrictions.Delivery & site · November 15, 2026 · 8 min
10

Heat Numbers and Rebar Traceability

A heat number identifies the batch of steel a rebar came from. Why you should track it from receiving to the job site, and how not to lose it.Shop & traceability · November 15, 2026 · 6 min
06

Reading the Bend Shapes on a Bar List

Why bent bars are described with standard shapes, why the detailer, the fabrication shop and the jobsite must read them the same way, and what a misread shape costs.Bar lists & tags · November 15, 2026 · 5 min
02

Billing and Negotiating Rebar Extras

A rebar extra gets paid when it's written down the same day: the request, the drawing revision, a before/after sketch, quantities, date and who asked for it.Estimating & billing · November 15, 2026 · 6 min
04

Excel, Homegrown or Rebar Software: When Is It Time to Switch?

A spreadsheet is enough as long as information doesn't change hands. A homegrown system depends on whoever built it. Here's when to move to rebar software.Software · November 15, 2026 · 7 min
13

The Rebar Tag: What It Has to Tell the Shop and the Jobsite

The rebar tag is made from the bar list and travels with the steel. What it tells cutting, bending, loading and the jobsite, and where it breaks down.Bar lists & tags · November 15, 2026 · 6 min
03

Estimating Rebar Placing in Hours per Tonne

Estimate rebar placing per tonne and per part of the structure: element type, bar sizes, access, season and crane all move the ratio. Your own jobs refine it.Estimating & billing · November 15, 2026 · 6 min
16

Spring Load Restrictions: Planning Rebar Deliveries

During the spring thaw, allowed truck loads are reduced on many roads. For rebar: more trips, deliver early, lighten loads, warn the job site.Delivery & site · November 15, 2026 · 5 min