Designation | Weight | Nominal Diameter | Pin Size | |||||
---|---|---|---|---|---|---|---|---|
400R or 500R | 400W or 500W | |||||||
(pound/foot) | (kg/m) | (mm) | (inch) | (mm) | (inch) | (mm) | (inch) | |
10M | 0.527 | 0.785 | 11.3 | 0.445 | 70 | 2.756 | 60 | 2.362 |
15M | 1.055 | 1.57 | 16 | 0.630 | 100 | 3.937 | 90 | 3.543 |
20M | 1.582 | 2.355 | 19.5 | 0.768 | 120 | 4.724 | 100 | 3.937 |
25M | 2.637 | 3.925 | 25.2 | 0.992 | 150 | 5.906 | 150 | 5.906 |
30M | 3.692 | 5.495 | 29.9 | 1.177 | 250 | 9.843 | 200 | 7.874 |