Here is a list of commonly used standards in Canada with specific documents for Quebec and Ontario.
Organization | Standard / Specification | Description |
---|---|---|
CSA (Canadian Standards Association) | CSA A23.1/A23.2 | Concrete: Constituents and Execution of Work / Standard Test Methods and Practices for Concrete |
CSA (Canadian Standards Association) | CSA A23.3 (C2010) | Design of Concrete Structures |
CSA (Canadian Standards Association) | CSA W186-FM1990 (C2016) | Welding of Reinforcing Bars in Reinforced Concrete Construction |
CSA (Canadian Standards Association) | CSA G30.18 (C2014) | Carbon Steel Bars for Concrete Reinforcement |
CSA (Canadian Standards Association) | CSA-G164-FM92 (C2003) | Hot-Dip Galvanizing of Irregularly Shaped Items |
ASTM | ASTM A955 / A955M – 18 | Standard Specification for Deformed and Plain Stainless Steel Bars for Concrete Reinforcement |
ASTM | ASTM D3963 / D3963M | Standard Specification for Fabrication and Jobsite Handling of Epoxy-Coated Steel Reinforcing Bars |
ASTM | ASTM A775 / A775M – 17 | Standard Specification for Epoxy-Coated Steel Reinforcing Bars |
ASTM | ASTM A767/A767M-16 | Standard Specification for Zinc-Coated (Galvanized) Steel Bars for Concrete Reinforcement |
ASTM | ASTM A780 / A780M – 09(2015) | Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings |
Ministère des Transports du Québec | CCDG – INFRASTRUCTURES ROUTIÈRES – CONSTRUCTION ET RÉPARATION, ÉDITION 2018 | General Specifications and Requirements for the Construction and Repair of Road Infrastructures |
Ministère des Transports du Québec | CCDG – INFRASTRUCTURES ROUTIÈRES – SERVICES DE NATURE TECHNIQUE, ÉDITION 2018 | General Specifications and Requirements for Technical Services in Road Infrastructures |
Ministère des Transports du Québec | CCDG – SERVICES PROFESSIONNELS, ÉDITION 2018 | General Specifications and Requirements for Professional Services |
Ontario Provincial Standards Specification (OPSS) | OPSS 905 | Steel Reinforcement for Concrete |
Ontario Provincial Standards Specification (OPSS) | OPSS 1442 | Epoxy Coated Reinforcing Steel Bars for Concrete |
Ontario Provincial Standards Specification (OPSS) | OPSS 1443 | Organic Coatings for Reinforcing Steel Bars for Concrete |