Barcodes and Machines: How Information Gets to the Bender

Why rebar tags carry a barcode, what it carries to the shear and the bender, why a standard format matters, and what a dimension retyped at the machine costs.

MBBy Maxime Beaupré · Updated on · 5 min

On a rebar tag, the barcode is there to carry the bar list information all the way to the machine without retyping it. The operator scans the tag, and the shear or the bender receives the bar's size, length and shape. When that data follows a standard format, any compatible machine can understand it. The goal is simple: the bar that's fabricated should be exactly the one the detailer described.

This article explains why the information has to reach the machine, why the tag is at the centre of that path, and what a retyped dimension costs. It doesn't describe how to produce the codes or how to set up a machine.

How does information get from the drawing to the machine?

The path is always the same. The detailer draws the bars and prepares the bar list. The fabrication shop's tags are made from the bar list. It's from those tags that the shop cuts, bends, bundles and loads the steel.

So the tag is the last document the operator holds before fabricating. It isn't the drawing, or the full bar list: it's a small card or plastic tag that describes one bar mark, and that will then follow the steel all the way to the jobsite. For what a good tag should contain, see the rebar tag.

The question is how the information written on the tag gets into the machine. There are two ways: the operator types it in, or the machine reads it.

Why not just type the dimensions in at the machine?

Because every dimension typed in is a chance for error. A straight bar needs a size and a length. A bent bar needs several segments, several angles and the matching cut length. The operator also has to know how bars are measured, and interpret the dimensions the same way the detailer did.

Here's a simple example. A bar list calls for 300 bars of 15M (about a #5) bent in an L. The operator types a segment of 1,200 instead of 2,100. The machine does exactly what it's told, 300 times. If nobody compares the first piece to the tag, all 300 bars are wrong, bundled and delivered. The error is found on site, and everything has to be redone.

That kind of error doesn't come from a lack of skill. It comes from information that was already typed once by the detailer, and that someone is asked to type again. The more hands it passes through, the more chances it has to change along the way. On this topic, see also reading the bend shapes on a bar list.

What does the barcode on a tag carry?

It depends on the code. A linear barcode, the kind you see on products in a store, mostly holds an identifier: a number that points to a line on the bar list. It's used to know which bar this is, to find it and to track it.

A two-dimensional barcode, such as PDF417, can hold much more: the full description of the bar, with its size, length, segments and angles. That's what lets a machine receive the complete shape in a single scan, without the operator typing anything.

Either way, the barcode doesn't make anything up. It carries what was on the bar list. If the bar list is wrong, the barcode will be wrong too, with perfect precision.

Why does a standard format matter?

A machine can't read just anything. For it to understand a barcode, the data has to be organized in a way it knows. The rebar industry has adopted a standard format to describe bars and their bends, which most modern machines can read.

That standard has an important practical consequence. A fabrication shop often has machines from several manufacturers, bought years apart. If each machine only understands data produced by its own manufacturer's software, the company has to live with several tools, retype the information from one to the other, and depend on that manufacturer for a long time. With a standard format, the same tag can be used on any compatible machine on the floor.

So when you choose a machine or a tool to prepare bar lists, the question to ask is simple: do both speak the same standard format? For the other criteria, see how to choose rebar software.

Why isn't a spreadsheet enough to get to the machine?

A bar list kept in a spreadsheet can be very well made. But it's still a list of cells. It doesn't produce tags with barcodes the machines can read, it doesn't let you scan bundles in the yard or at loading, and it doesn't link the fabricated bars to the heat numbers of the steel used.

The result: the bar list information has to be retyped, either on a tag, at the machine or both. That's exactly the step where costly errors slip in. For a closer look at this problem, see why a bar list built in Excel costs more than it looks.

Does the barcode replace checking?

No. The barcode removes a step where mistakes happen; it doesn't remove the operator's judgment. The operator still loads the bar, compares the first piece to the tag and stops the machine if the shape doesn't look like what's expected. A machine that reads wrong data fabricates it just as fast as good data.

The shop foreman remains responsible for what leaves the floor. What the barcode mainly gives the foreman is one thing: the certainty that if a bar is wrong, the error doesn't come from a retyped dimension, and that you have to look further upstream, at the bar list or the drawing. That cuts down the number of places to look.

What is the barcode used for after the bender?

The same barcode keeps working once the bar is fabricated. The tag stays attached to the bundle, and every time it's scanned, you know where the steel stands: fabricated, waiting in the yard, loaded on the truck, delivered.

It's also what lets you link a bar to the steel it's made from. When the heat number follows the tag, you can find, years later, which batch of steel a bar placed in a structure came from. See heat numbers and traceability.

And on site, the tag remains what it has always been: the way to know which bar goes where, by reading the mark.

What simple idea is behind the barcode?

The barcode isn't complicated technology. It answers a simple idea: a bar's information should be written once, by the person who knows it best, then read everywhere else, in the shop and on site, from drawing to invoicing. Every time you retype a dimension, you add a chance for error. Every time you read it, you remove one.

Metacis is rebar software designed by people in the trade. If bar lists are a question in your company, let's talk: request a demo.

Share

Frequently asked questions

Related articles

Metacis is rebar software designed by people in the trade.